 
                                  Construction will start on Wed. July 9 – Fri. July 11 for Sam Cobb Road Resurfacing. Sam Cobb Rd will not be open for through traffic from 7am-4:30pm on 7/9, 7/10, & 7/11. The road will be open to local traffic only. Thank you for your cooperation!
Posted on July 25, 2025
 
                                  Construction will start on Wed. July 9 – Fri. July 11 for Sam Cobb Road Resurfacing. Sam Cobb Rd will not be open for through traffic from 7am-4:30pm on 7/9, 7/10, & 7/11. The road will be open to local traffic only. Thank you for your cooperation!